ZP19080 Oasis Poolside Organizer Installation Guide
ZP19080 Oasis Poolside Organizer
Approximate assembly time is 90 minutes
Click here to view an installation video
Introduction
General Information
Important Safety Notes:
- Check the inside of the larger pieces in your box for other materials packed inside.
- When assembling components, place on a non-abrasive surface (i.e., shipping box) to avoid scratching.
- We recommend an area approximately 5' x 8' for unobstructed assembling.
- You should not need to use excessive force when assembling components.
Returns:
If you wish to return your product, please contact us first — we can often help resolve the issue right away.
If a return is still necessary, it must be initiated with the retailer where the product was purchased.
Need Help or Replacement Parts?
Although great care has been taken to ensure proper packaging and handling of this product, occasional issues can occur.
If you need replacement parts, assembly assistance, or have questions about the product, our customer service team is happy to help.
- Website: https://parts.nychbrands.com
- Email: support@zippity-outdoor.com
- Phone: 704-892-5222 or 877-234-6196
Customer service agents are available 9am–5pm EST, Monday–Friday.
For Quick Assistance:
- Have reference item number ZP19080
- Provide the specific part name
- Include the batch lot number
Product Specifications
Detailed Dimensions & Specifications
Product Specifications:
- Overall Dimensions: 48" W x 30" L x 75½" H
- Floor weight capacity: 20 lbs
- Includes adjustable slat, mesh bags, towel hooks, and bungee connectors
- Designed for outdoor poolside organization
Lay Out Materials
Power Drill and Drill Bit
Required for a smoother installation experience.
A. Post A (1)
2¾" x 2¾" x 40"
B. Post B (1)
2¾" x 2¾" x 40"
C. Post C (1)
2¾" x 2¾" x 75⅜"
D. Post D (1)
2¾" x 2¾" x 75⅜"
E. Bottom Board Long – Front (1)
44¼" x 7⅜" x ⅞"
F. Bottom Board Long – Back (1)
44¼" x 3" x ⅞"
G. Short Bottom Board (2)
26⅜" x 7⅜" x ⅞"
H. Short Slat (4)
26⅜" x 3" x ⅞"
I. Floor Board (6)
26⅞" x 4½" x ⅞"
J. Long Adjustable Slat (1)
42" x 3" x ⅞"
K. Long Slat (18)
44¼" x 3" x ⅞"
L. Post Filler (38)
1" x 1" x ⅜"
M. Post Filler (4)
3⅜" x 1" x ⅜"
N. Post Filler (2)
8½" x 1" x ⅜"
O. Post Filler (8)
11⅛" x 1" x ⅛"
P. Post Filler (2)
11½" x 1" x ⅛"
Q. Post Filler (2)
35½" x 1" x ⅜"
R. Post Hinge (4)
S. Post Cap (4)
T. Towel Hook (6)
U. Long Self-Drilling Screw (40)
2½" Long
V. Bungee Connector (2)
W. Bungee (3)
X. Mesh Bag (2)
Step-by-Step Assembly
Step 1
- Slide (2) Spacers (M) to bottom of Post (C) until it meets the post cap.
Step 2
- Align Posts (C) and (D) as shown.
- Assemble on box of other smooth surface to prevent scratching.
Top Down View
Step 3
- Insert Bottom Board Long - Back (F) with supports facing upward.
Step 4
-
Temporarily place (1) Long Slat (K) to hold the frame square.
Note: You will remove Long Slat (K) after Step 5.
Step 5
- Attach Bottom Board Long - Back (F) using (4) Long Self-Drilling Screws (U).
Tip: Ensure the bottom board is pushed to the back of the post channels before driving your screws.
- Remove Long Slat (K).
Step 6
- Install (34) Post Fillers (L) and (17) Long Slats (K).
Step 7
- Secure with (2) Long Self-Drilling Screws (U).
- Flip panel
Step 8
- Insert (2) Short Bottom Boards (G) into Posts (C) and (D).
Step 9
- Secure using (4) Long Self-Drilling Screws (U).
Step 10
- Temporarily insert (2) Short Slats (H).
Step 11
- Slide (2) Spacers (M) to the bottom of Post (A) until they meets the post cap.
Step 12
-
Set Posts (A) and (B) over the boards as shown.
-
Align wheel positioning per diagram for Post (B).
Note: Make sure your wheel is in-line with the back wheel.
Step 13
- Secure Posts (A) and (B) using (4) Long Self-Drilling Screws (U).
Step 14
-
Install Bottom Board Long - Front (E).
Note: Ensure pre-installed floor support is at the bottom of Bottom Board Long - Front (E) when inserted into the posts.
Step 15
- Secure using (4) Long Self-Drilling Screws (U).
Note: Remove Short Slats (H) after this step, before standing your poolside organizer up.
Step 16
-
Secure (1) Bungee Connector (V) into (1) Short Slat (H) with (3) Long Self-Drilling Screws (U).
Note: End of bungee connector will be roughly 5 inches away from edge of short slat.
-
Repeat this twice.
Step 17
- Install (4) Post Fillers (O).
Step 18
-
Install (2) Short Slats (H) from Step 16.
Note: Make sure you have installed the Bungee Connectors (V) from Step 16.
Step 19
-Install (4) Post Fillers (O) and (2) Short Slats (H)
Step 20
- Secure using (8) Long Self-Drilling Screws (U).
Step 21
- Install (6) Floor Boards (I).
Floor weight capacity: 20 lbs.
Step 22
- Install (2) Post Fillers (L), (2) Post Hinges (R), and (2) Post Fillers (N).
Step 23
- Secure using (2) Long Self-Drilling Screws (U).
Step 24
- Install (1) Long Slat (K).
Step 25
- Secure Long Slat (K) with (4) Long Self-Drilling Screws (U).
Step 26
- Install (2) Post Fillers (P), (2) Post Hinges (R), and (2) Post Fillers (L).
Step 27
- Secure using (2) Long Self-Drilling Screws (U).
Step 28
- Install Long Adjustable Slat (J).
Tip: For easier access place the long adjustable slat in the lower position.
Step 29
- Install (2) Post Fillers (Q).
Step 30
- Install (3) Bungees (W).
Step 31
- Install (4) Post Caps (S).
- Install (6) Towel Hooks (T). Towel hooks can be arranged to fit your needs.
Need Help?
- Email: support@zippity-outdoor.com
- Phone: 704-892-5222 or 877-234-6196
- Text: 980-580-6508